 THE INTRODUCTION
                           The CEO of
                    Meet Larry,

                    Tasty Burgers.
                    Tasty Burgers is receiving
                                      poor
                    customer feedback.
                    Customers are leaving him for
                    other competitors.
TABLE Group 03

 THE METHODOLOGY
                       DMAIC
                   Define   Measure   Analyze

                       Improve   Control
TABLE Group 03


    Wait-time for other competitors were collected.
DEFINE
            •Best in class competitors had a
             waiting time of 3-5 minutes.

            •Tasty Burgers had a waiting
             time of 6.4 Minutes.


                 The Target would be to achieve a waiting time
                           between 3-5 minutes.
The other aspects were also measured.
DEFINE
         SERVICE          Good
         WAIT-TIME        Poor
         TASTE            Excellent
         CLEANLINESS      Excellent
         STAFF BEHAVIOR   Good
         OVERALL          Fair
TABLE Group 03




                 ACHIEVE
MEASURE
                 a time which is
                 Between 3
                 to 5
                 minutes!
TABLE Group 03

ANALYZE          Documentation of Process
           •Receiving the order-00.30
           •Transfer the Order to the Kitchen-00.30
           •Acquire the materials like Bread, Cheese,
            Toppings, Sauces etc.-01.00
           •Final preparation of burger-03.00
           •Presentation of the burger-01.00
           •Deliver to the customer-00.10


            TOTAL TIME TAKEN- 06min and 10sec
TABLE Group 03

ANALYZE                Elevator Speech

            “It has been observed that Tasty Burgers is taking a lot of
            time to deliver the burgers to the customers and that is
            why it has received a very poor rating on the waiting time
            and is losing out it’s customers to competitors.
            The main purpose as such is to identify those processes
            that is taking up the time with the help of LEAN tools such
            as MUDA, 5S,Poke-Yoke and ensuring that the processes
            are streamlined and handled more efficiently by
            employing JIDOKA.”
TABLE Group 03

ANALYZE                    Scoping

                   Scope of operation includes:
            • Decreasing delivery time
            • Re-arrangement of Assembly line
            • Increase the efficiency of order taking
TABLE Group 03

ANALYZE          Analyze using LEAN tools
           TOOL MUDA
           •With MUDA methodology- wait time, human motion, unplanned inventory,
           extra processing and unnecessary transportation are found to be the
           defective.

           •Due to inefficient HUMAN MOTION there is a delay in the processing time
           of the burger and this can be reduced. Jidoka can be used to automate the
           process of acquiring of materials and this can reduce the time from 40
           seconds to 20 seconds.

           •There is also the problem of UNNECESSARY TRANSPORTATION. During the
           process of preparing the burger, instead of the chef moving around, the
           things should rather come to him/her. This can greatly reduce the time taken
           to prepare one unit.
TABLE Group 03

ANALYZE          Analyze using LEAN tools
           TOOL 5S: sort→ straighten →shine →standardize →sustain
           •SET IN ORDER can be used to compare what should be present with what
           actually is there in the process and based on that a better protocol can be
           established.

           •By using the aspect of STANDARDIZE which advocates the concept of
           “everything in a state of order” a very flawless and streamlined process to
           procure the materials can be established which otherwise is not present
           thus contributing to the higher time of waiting.

           •The frequency, rush hour and number of burgers sold is analyzed: pre-
           heated burgers.
TABLE Group 03

IMPROVE     What is the change in Plan?
           •Receiving the order-00.20
           •Transfer the Order to the Kitchen-00.30
           •Acquire the materials like Bread, Cheese,
            Toppings, Sauces etc.-00.40
           •Final preparation of burger-02.00
           •Presentation of the burger-0.40
           •Deliver to the customer-00.10


            TOTAL TIME TAKEN- 03min and 40sec
TABLE Group 03

IMPROVE     What is the change in Plan?
            According to our analysis we found that the
            majority of defects and delays were because of
            inappropriate assembly line starting from
            allocating the inventory to the delivery of the final
            product.


            OLD TIME: 06min and 10sec
            NEW TIME: 03min and 40sec

            Difference: 03min and 10sec
TABLE Group 03

CONTROL   How will we control the changes
           •Sustaining the improvement.
           •Introduction of a Countdown timer whenever
           each order is placed, the aim being to deliver the
           order before the alarm- sound or light.
           •Maintaining a log of the different types of burgers
           sold and preheating the burgers based on the log
           generated so as to reduce the waiting time.
           •Putting Penalty on Delays.
           •Recording the delays and adjusting the time
           constraints.