The document discusses material requirements planning (MRP) and its use at Collins Industries, a large ambulance manufacturer. Collins requires an MRP system to manage its large inventory of 18,000 item codes and meet production needs. An effective MRP system requires accurate data on the bill of materials, inventory levels, outstanding orders and component lead times. The MRP system then calculates material needs based on the master production schedule to ensure availability of all parts.