Skip to main content
Account

Table 7 Optimized LCOE and corresponding plant parameters for GDE3

From: Stochastic optimization framework for capacity planning of hybrid solar PV–small hydropower systems using metaheuristic algorithms

Parameter description

Minimum

Mean

Maximum

Levelized generated energy (GWh)

506.76

628.33

708.06

Levelized energy production cost (million USD)

32.14

43.97

63.18

Capacity of the solar PV plant (MWp)

5.00

7.90

10.00

Installed discharge for the SHPP (m3/s)

0.895

1.18

1.26

Number of turbines

2

2

3

Capacity of the SHPP (MW)

4.80

6.32

9.39

Capacity factor for hydro (%)

69.36

80.44

85.22

Capacity factor for solar (%)

19.70

19.71

19.72

Capacity factor-hybrid solar PV-SHPP (%)

42.15

47.26

53.34

LCOE (US ₵/kWh)

6.34

7.00

8.92